Product Short Description
Product Name: TURBOVAC 50 Turbo Molecular Pump
Product Introduction: Compact, oil-free-on-process-side turbo molecular pump for high and ultra-high vacuum systems; designed for clean vacuum environments requiring low contamination and fast pumpdown.
Technical Specifications:
- Pumping Speed (N₂): ~50 L/s
Description
- Ultimate Pressure: <1×10⁻⁸ mbar with suitable backing pump
- Inlet Flange: DN 63 ISO-K (DN 40 KF optional)
- Foreline Flange: DN 16 KF
- Max Foreline Pressure (N₂): ~1×10⁻¹ mbar
- Rotation Speed: up to ~72,000 rpm
- Bearings: Hybrid ceramic ball bearings
- Lubrication: Grease-lubricated; no oil on process side
- Cooling: Air convection (water cooling optional)
- Drive: External controller / frequency converter (e.g. NT 1090)
- Mounting: Any orientation
Functional Features:
- Oil-free pumping on vacuum side
- Low vibration and low acoustic noise
- Fast start-up and short pumpdown time
- Compact footprint for space-limited systems
- High reliability for continuous operation
Application Scenarios:
- Semiconductor process chambers
- Mass spectrometry
- Electron microscopy
- Thin-film coating
- Helium leak detection
- R&D high-vacuum systems
Performance Parameters:
- Compression ratio for N₂: very high
- Compression ratio for H₂: lower than heavy gases
- Start-up time: typically a few minutes to full speed
- Backing pump example: Leybold TRIVAC D 2.5 E
Material Composition:
- Pump housing: aluminum / stainless steel
- Rotor blades: lightweight aluminum alloy
- Bearings: steel rings with ceramic balls
- Seals: vacuum-compatible elastomers / metal options
Structural Characteristics:
- Multi-stage turbomolecular rotor
- Stationary stator blade stages
- Integrated bearing system
- Controller-separated design
Working Principle:
High-speed rotor blades transfer momentum to gas molecules, directing them from the high-vacuum side toward the foreline; a backing pump removes gas from the low-vacuum side.
Installation Requirements:
- Match inlet and foreline flange types
- Use compatible backing pump
- Ensure adequate ventilation or cooling
- Avoid excessive inlet particulate contamination
- Install with proper grounding and EMC compliance
Usage Precautions:
- Do not exceed maximum foreline pressure
- Do not operate with contaminated or particulate-heavy gas unless protected
- Allow full spin-up before process gas admission
- Use water cooling only if configured
- Perform periodic bearing and controller maintenance





Reviews
There are no reviews yet.